oshlo.blogspot.com - Construction of the dragon bridge began on 19 July 2009 . Dragon Bridge is 666m long, 37.5m wide and has six lanes for traffic. It opened to traffic on March 29, 2013, at a cost os nearly VND 1.5 trillion dong (US$88m). The bridge was opened to traffic on March 29, 2013, the 38th anniversary of the liberation of Da Nang City.source
Visitor's Like This Page.

.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
0 Response to "[Beautiful] Dragon Bridge Vietnam"
Posting Komentar