.jpg)
oshlo.blogspot.com - Construction of the dragon bridge began on 19 July 2009 . Dragon Bridge is 666m long, 37.5m wide and has six lanes for traffic. It opened to traffic on March 29, 2013, at a cost os nearly VND 1.5 trillion dong (US$88m). The bridge was opened to traffic on March 29, 2013, the 38th anniversary of the liberation of Da Nang City.
source Visitor's Like This Page.


0 Response to "[Beautiful] Dragon Bridge Vietnam"
Posting Komentar